Durham, NC

Summit Church

Our HVAC solutions for Summit Church allowed them to control and monitor the system throughout their entire facility.

Construction lifts for HVAC installation at a church campus

Value Delivered

We provided a fully-automated HVAC solution that allowed the client to control, schedule, and monitor the system throughout their entire worship facility.

Client Objectives

When Summit Church built their new Capital Hills campus, it included over 90,000 square feet of worship space. Newcomb was chosen as the mechanical contractor to supply needed HVAC solutions throughout this space.

Solutions

Our mechanical systems solutions consisted of:

  • 19 packaged rooftop units totaling 461 tons of cooling and 130,000 pounds of sheet metal
  • Full automation to control, schedule, and monitor the system throughout the facility

Client Background

The Summit Church is a Southern Baptist church headquartered in Durham, North Carolina. It has 11 campuses.